Tuesday, May 9
- Crack-fill 1 coat in guest room
- Paint second coat on office door
- Paint second coat on top half of hallway
- Wash more grout haze off tiles in back hallway
Wednesday, May 10
- Crack-fill guest room
- Clean out third bedroom
- Hang drywall in third bedroom
- Paint second coat on bottom half of hallway
Thursday, May 11
- Crack-fill guest room
- Crack-fill third bedroom
- Install doorknob on office door
- Clean remaining grout haze off tiles in back hallway
- Sand the bed in preparation for varathaning
Friday, May 12
- Crack-fill guest room
- Crack-fill third bedroom
Saturday, May 12
- Varathane (first coat) bed
- Hang door to half-bath
- Move tools to garage (yippee!)
We finally got our taxes back, so we’re in the midst of scheduling the electrician to come out and put power to the garage along with finishing up inside the house. There are still a few things that aren’t ready to be done yet, but we can finish those up later. I can’t wait to have my light over my sink, as well as the lights in the master bath on a switch! Currently we have to go down and switch the breaker on and off every morning ;) Getting the tools out of the house will be a huge improvement in being able to get (and keep) things cleaned up.
No comments:
Post a Comment