Thursday, August 03, 2006

Weekly Schedule

I was reading back over some older posts and I am completely amazed at what we managed to accomplish in an evening. I think this was due in part to having a plan posted so that we had to be accountable if we decided to just sit on our butts and do nothing instead of what was on the list ...

So here is our plan for the next few days:

Thursday
  1. Cut bottom off doors to master bath and office (they are too long now that the hardwood is in place). Hang doors
  2. Clean mortar off tiles by stove. Get ready for grout.
  3. Paint 1 coat on door to master bath.
  4. Finish framing closet in back hall.
Saturday
  1. Lay tiles we removed and some in entryway.
  2. Hang remaining drywall in spare room and back hall. That's all for drywall - yay!
  3. Cut remaining panels for pantry and oven cupboards.
  4. Start putting together boxes for pantry and oven cupboards.

Monday
  1. Lay more tile.
  2. Put together boxes for pantry and oven cupboards.
Tuesday
  1. Grout tile.
  2. Work on face frames for pantry and oven cupboards.
I have purposely made these goals very attainable so we can feel a sense of accomplishment by actually completing our list ;) Maybe we'll even be able to exceed our expectations!

Tuesday, August 01, 2006

Back in the groove

After a few unproductive weeks, Peter and I are ready to get back in the groove of finishing up the house. I've noticed we tend to cycle like that and I think it's necessary for our sanity!

We did manage to finish up the hardwood last week (yippee!) and we also cut out some of the panels for the pantry and oven cupboards before we ran out of plywood. We have an order in for 3 more sheets that will hopefully come sometime this week. We took some time on Saturday to clean up the garage and move the remaining plywood from the kitchen to the garage.

This week our focus turns to tiling downstairs and finishing up the pantry and wall oven cupboards. If the wood doesn't arrive on time I may be able to convince Peter to do some crack-filling. We shall see ...

Tomorrow night I plan on cleaning off some of our tiles that were never grouted in the kitchen (they were hiding under the plywood). I think just getting the mortar off will take all night. We laid these tiles before we got into the habit of keeping it neat in order to avoid the painstaking hours cleaning the mortar off the tiles ;) Thursday night the plan is to actually grout those tiles, and then on Saturday I'll get back to laying tile in the entryway. We're on vacation next week and will have several full days to work on the house - look for progress pics!

Sunday, July 16, 2006

Eye Candy

Getting the flooring laid in our bedroom has allowed me to see the potential for finishing this house someday - what a difference! I love how bright our room is.

Our schedule for this week is sort of up in the air, but the goal is to finish all the hardwood by Friday night. We only have one complete room and a few end rows in other rooms to finish.

As for after the hardwood is finished, our focus will turn to our next big project - finishing the flooring downstairs. Not one I'm looking forward to, but it is the last really large "quality of life" project we have to undertake.

While I'm tiling downstairs Peter is going to build a closet organizer for the closet in the office and then get to work building the pantry and oven cupboards for the kitchen.

One day at a time ...




Monday, July 03, 2006

Flooring pics :)





Here are some pictures of our work over the long weekend!

Tuesday, June 27, 2006

Let's be realistic ...

So ... now that all of you who have actually laid hardwood before have had a good laugh at the progress we expected to make during our first attempt at installation, we'll revise our goals to more closely model reality.

What actually happened on the weekend was we got almost 2 sides of the hallway (our hallway is shaped like a U) done, we painted the front wall in the hallway, and burned some scrap lumber.

So ... our new schedule looks like:

Tuesday: Peter - finish laying hardwood on first two sides of hallway along with a few rows into the office and guest room. Angela - teach a friend how to lay tile.

Wednesday: Worship team practice. Possibly lay some hardwood once we get home.

Thursday: Lay hardwood in guest room.

Friday: Lay hardwood in office (finish guest room first if not completed).

Saturday: Hang door in master bath. Lay hardwood in office. Lay remaining tile in master bath and laundry room (just a few tile - maybe 10 total).

Monday (yay - holiday!): Grout tiles laid on Saturday and tub surround. Lay hardwood on third side of hallway.

Hopefully this schedule is reasonable. I'll let you know ;)

Thursday, June 22, 2006

The Finished Product!

Aren't they purty?

What a great night we had. As you can see below, Peter got started laying hardwood while I got the first coat of paint on the guest room.

I realized that we were getting much more done when I was posting our schedule every week, so here's our hopes for the week:

Friday: Lay hardwood in hall. Second coat on guest bedroom.
Paint coat on front wall in hallway.

Saturday: Lay hardwood in guest room. Second coat on
front wall in hallway. Clean up :)

Wednesday: Hang door to master bath. Lay remaining tiles in
laundry and master bath.

Thursday: Lay hardwood in office. Work on tiling downstairs.

Friday: Lay hardwood in hallway. Work on tiling downstairs.



Saturday: Lay hardwood in master bedroom. Work on tiling
downstairs.

Monday: Lay hardwood in master bedroom. Work on tiling
downstairs.





















Tuesday, June 20, 2006

I'm a happy girl... :)

I'll let the pictures speak for themselves!





Monday, June 19, 2006

The Stairs ... With Treads!

Wow - what a day! When we came home this afternoon after work the stair guy (we should really find out his name!) had all the risers and treads on the stairs. It looks so nice!

There's not much else to say ... I'm enjoying having real stairs :)

Sunday, June 18, 2006

The Stairs ... Before

Here is a picture of the stairs before the stair company started work on them ... as well as a picture of our balusters that we've come to know pretty well as we applied two coats of polyurethane to them.




The batteries on our camera died this weekend, but I'll try and get some pictures as soon as we get them replaced of how the work is progressing.

Thursday, June 08, 2006

I'm getting sleepy ...

We are definitely not used to working as hard or long on the house as we did last night (unlike in the early days!), and my bleary eyes this morning are evidence of this fact. We got the wood for the stairs on Tuesday night, and after we got home at 9:30 we worked until 11 getting stands made for the balusters and sawhorses.

Last night we got right to work after supper finishing the pieces for the stairs. It's very easy to do, and you can sit and listen to tv or music while you do it, but it's very time-consuming. We worked until 1 a.m. and managed to get a coat of poly on: 86 balusters (yes, I was keeping track! - only 18 left), all 15 treads top and under the nosings, the nosing around the top of the stairs, half of the skirt boards, and all the handrail (except a couple of small S-turn pieces). As we had to get up at 5 this morning we decided we should head to bed at that point. Tonight's plan is to get the first coat on everything we didn't get done last night and then sand what we finished last night so it's ready for a second coat. Hopefully we can get a bit more sleep tonight, too. I don't think I'll make it tomorrow otherwise!

It is very interesting to maneuver downstairs through all the stair pieces as they dry - I'll try and get a picture tonight!

Monday, June 05, 2006

Finally!


You may remember a few weeks ago, when I actually kept this blog up-to-date, that I mentioned that a guy was coming to tile our tub
surround. Well … that guy ended up not working out (Mom always said if I can’t say anything nice … ;) ) so we finally got someone else to come
out today. This guy was a bit more expensive, so to save a bit of money we decided we would grout it ourselves.

You may also remember that I said our wood stairs place said we would get the pieces for our stairs in “lots of time” to get them finished before they come to install them next Monday, June 12th … Well, we finally called today after not hearing from them for a few weeks, and apparently “lots of time” translates to 6 days. Do they realize that we have day jobs?? Anyway, if anyone reading this is really bored, we’ll have about 100 balusters at our house tomorrow to get three coats of poly on before next Monday … ? Or, if balusters aren’t your style, can we interest you in some handrail, nosing, or treads? lol. After tonight that will obviously be our focus for the next week.

We have done a minimal amount of work on the house as of late for some reason. I finally got the guest bedroom primed on Saturday. We also got 4 coats of varathane on our bed and put the mattress back in its rightful place last night. Our bedroom looks so much bigger without two queen-sized beds set up!

A friend at church loaned us his pneumatic flooring nailer the other day, so we’ll have that to get started right away on the hardwood floor once the stairs are in. Exciting!

Monday, May 22, 2006

Disappointed but busy



Well, none of our contractors have come through for us this week, but we won't talk about that right now ;) I'm not such a happy girl about all of that. In spite of that, I've managed to lay about 80 sq. feet of tile in the past couple of days and I'm pretty happy with how it's turning out. I'm just getting ready to grout, but thought I'd put up a few pictures of what it looks like now.

Thursday, May 18, 2006

It never rains but it pours

This is true both literally and figuratively around here lately ;)

After several stalled weeks on house progress we've had a flurry of activity yesterday and today. Yesterday we booked the company to do our hardwood stairs. We decided to finish them ourselves after seeing the exorbitant cost of labour to have someone else do it. Wish us luck! The installers will be putting the stairs in from June 12th - 19th, which means we will have to get two coats of polyurethane on them before that. We haven't heard when we'll be getting the pieces yet, but the guy who we talked to said we would get them in "lots of time." I'll let you know how much time in days that works out to ;)

In addition, our electrician called yesterday to say he's ready to come finish up the electrical work. Last night I spent an hour or so making sure we had everything well-marked for him as we won't be able to be there. Hopefully when we go home all the lights that are currently in boxes on the floor will be hung (in the right spots)! We're looking forward to being able to use the rest of the outlets in our bedroom and bathroom :)

Last night we also had an electrician out to get measurements for a quote on putting power to the garage. He should be ready to perform the work early next week. Yay!

And finally, the guy who's going to tile our tub surround is coming over tomorrow to do that. That will be very exciting. Peter has to get the plywood screwed on the surround tonight in order for everything to go smoothly tomorrow.

Whew! See - lots of progress, although not much work being done on our part! We did move quite a bit more out to the garage last night, and I did lots of clean-up inside the house. We moved the kitchen table over to where it will eventually sit for good - it looks so nice! It also looks really empty in front of the wood stove. We don't have any of the furniture we want to put there eventually yet so we'll have to figure something out there :)

That's about it for us. I'll let you know how everything goes over the next couple days (maybe even some pictures :) )

Thursday, May 11, 2006

Checking things off ...

Last night we actually had a good night of working on the house. Tuesday night wasn't so great for me. Peter got his crack-filling done that night, but all I managed to do was get the second coat of paint on the office door. I find it hard after having a break from working on the house to get back into the mindset of working after supper ;0)

Last night we were both moving quickly. Peter got another coat of crack-fill on the guest bedroom and it's really coming along. I washed the grout haze off the tiles in the back hallway (finally!) and got the second coat of paint on the top half of the hallway.

On the docket for tonight - get the doorknob on the office door, hang the half-bath door, clean out third bedroom. Those are the "must-do's" for tonight. Other things I'd like to get done include: hang drywall in third bedroom closet, paint bottom half of hallway, another coat of crack-fill on guest bedroom. Obviously we can't accomplish all of that tonight!

The reason I'm focusing on the third bedroom is that Peter has tomorrow off of work and he's going to spend his vacation day crack-filling (what a good man!). We don't want him to run out of rooms to crack-fill so I'm going to make sure that third bedroom is ready to get a first coat tomorrow (at least the main part of the room if not the closet as well).

Nothing much has been happening that we can take pictures of lately ... sorry! lol

Tuesday, May 09, 2006

Weekly schedule ...

Our weekly goals are quite lofty this week after the dismal progress over the last couple of weeks.

Tuesday, May 9
  • Crack-fill 1 coat in guest room
  • Paint second coat on office door
  • Paint second coat on top half of hallway
  • Wash more grout haze off tiles in back hallway

Wednesday, May 10
  • Crack-fill guest room
  • Clean out third bedroom
  • Hang drywall in third bedroom
  • Paint second coat on bottom half of hallway

Thursday, May 11
  • Crack-fill guest room
  • Crack-fill third bedroom
  • Install doorknob on office door
  • Clean remaining grout haze off tiles in back hallway
  • Sand the bed in preparation for varathaning

Friday, May 12
  • Crack-fill guest room
  • Crack-fill third bedroom

Saturday, May 12
  • Varathane (first coat) bed
  • Hang door to half-bath
  • Move tools to garage (yippee!)

We finally got our taxes back, so we’re in the midst of scheduling the electrician to come out and put power to the garage along with finishing up inside the house. There are still a few things that aren’t ready to be done yet, but we can finish those up later. I can’t wait to have my light over my sink, as well as the lights in the master bath on a switch! Currently we have to go down and switch the breaker on and off every morning ;) Getting the tools out of the house will be a huge improvement in being able to get (and keep) things cleaned up.

Monday, May 08, 2006

Another day, another paint colour

Here is our main hallway / landing area upstairs with one coat of each colour on the wall :















I'm quite happy with the way it turned out, although it's not even close to what I had envisioned in my head. I did the top colour first and definitely wasn't convinced with just that colour, however when I added the lower colour tonight it started to grow on me.

I'll post our weekly schedule tomorrow - time to watch 24!

Thursday, May 04, 2006

I'm impressed ...

I logged in this morning to check our goals for the week and see how we're doing, and realized that we're doing quite well! Tuesday night we hung the rest of the drywall in the guest / front bedroom and I made a first draft of a list of things for the electrician to finish up.

Last night I grouted the floor in the back hallway and painted the ceiling in the upstairs hallway. Tonight the plan is for Peter to get the first coat of crack-fill on the guest bedroom while I get the first coat of paint on the upstairs hallway walls. I'm so excited - we're doing a chair rail and shadow striping, so lots of fun!

Peter also lined up a locksmith to come out and fix the handle on our front door (anyone who's ever tried to open our front door knows what I mean!) and install the lock and handle on the garage. Guess what that means ... we can start moving tools! I'm so excited. Now if our tax return would just come back so that we can get the power hooked up out there!

Tuesday, May 02, 2006

Weekly Plan

I tried to post this yesterday but was getting errors from Blogger - seems to be a common occurrence lately :(

So .. this will be a short post as I have to get to work in 5 minutes.

Last week we didn't get anything done on the house unfortunately. This week we're still pretty busy with non-house-related stuff, but we'll try and make good progress during the time we do have. So, our goals for this week are:
  1. Hang rest of drywall in guest room
  2. Get a good start on crack-filling guest room
  3. Grout floor in back hallway
  4. Paint hallway (ceiling and walls)
  5. Make list of things for electrician to finish up
We should get started on our list tonight :)

Monday, May 01, 2006

Weekly Schedule

As much as I would like to catch up after not doing anything last week, it doesn't look like that will happen this week either. We should be able to make some progress, but not as much as we could with a completely free week and weekend ... Our goals for this week are:
  1. Hang remaining drywall in guest room (front bedroom with two windows).
  2. Get a good start on crack-filling guest room.
  3. Grout flooring in back hallway.
  4. Paint upstairs hallway.
  5. Hang door to half-bath? (maybe)
Ugh. It seems like so little when I type it out ;) Hopefully we can at least get that much done.

Weekly Schedule

As much as I would like to catch up after not doing anything last week, it doesn't look like that will happen this week either. We should be able to make some progress, but not as much as we could with a completely free week and weekend ... Our goals for this week are:
  1. Hang remaining drywall in guest room (front bedroom with two windows).
  2. Get a good start on crack-filling guest room.
  3. Grout flooring in back hallway.
  4. Paint upstairs hallway.
  5. Hang door to half-bath? (maybe)
Ugh. It seems like so little when I type it out ;) Hopefully we can at least get that much done.