Well, I thought it was probably a good time for an update. We are still working on financing, although things are looking up (we think). We should know by the end of the week for sure.
Things in other areas are moving right along. Our excavator / septic contractor dug the hole for the foundation and put the septic tank in place today. Tomorrow he's bringing in the rest of the rock that will have to go under the concrete pad, since we're building on a slab. We arranged to have the concrete, rebar, joists, and trusses delivered according to our proposed building schedule. If everything goes well, we should be framing the house the second and third weeks in May. Yippee!!