Our short-term goal is to have the house ready for the plumber by March 25th. Here is the list of what's left to finish for that goal:
- Paint half-bath ceiling
- Paint half-bath walls (2 coats)
- Lay floor in half-bath
- Grout floor in half-bath
- Finish crack-filling master bath
- Joint and plane boards for master bath vanity face frame
- Attach face frame to master bath vanity
- Stain vanity (2 coats)
- Varathane vanity (2 coats)
- Prime master bath
- Paint ceiling in master bath
- Paint walls in master bath (may only need 1 coat as it's white over white primer)
- Install master bath vanity
Tuesday:
- Lay tile in half-bath
- Crack-fill master bath
- Plane boards for face frame
- Plane boards for face frame
- Lay rest of tile in half-bath
Friday:
- Paint half-bath (ceiling and walls)
- Put together face frame
- Attach face frame to vanity
- Stain vanity (coat 1)
- Paint half-bath walls
- Prep and grout floor in half-bath
- Crack-fill master bath
- Stain vanity (coat 2)
And, as you can see, I'm starting to customize some links and trackers at right. It's about time!